加拿大论文代写

乔治王子城论文代写:风险调查

乔治王子城论文代写:风险调查

参与实施和规划阶段的所有团队都应考虑对关键活动中面临的一些风险进行调查。这些风险包括与财务、经营、责任、基于声誉的风险和业务中断有关的风险,以及主动管理和减轻风险。在风险管理方面采取的这些方法包括采用更严格的安全程序,以便通过保险从第三方转移风险。公私伙伴关系具有抵消东道国政府财政风险的趋势。大型活动的举办为先进技术的发展和活动本身的设计提供了重要的机遇。然而,它确实有更大的影响。众所周知,它推动了新技术的引进,对整个经济产生了积极的冲击,加快了城市转型和创新。

乔治王子城论文代写:风险调查
然而,为大型活动而建造的一些标志性建筑终结了设计的边界。作为一个重要的例子,蒙特利尔的测地线穹顶,现在被认为是一个基于环境的博物馆,已被确定为1967年世博会的持久遗产(Jago et al. 2010)。但创新的延伸远远超过了活动地点。的投资在2010年南非世界杯,包括创新高效的街道照明和交通管理系统,体育场泛光灯的能源效率在体育场腓立比,加热器的太阳能水附在屋顶整个西部地区的斗篷和代水电从泉水。但是,在认识到国家未来需要和期望的同时,必须发展基础设施。

乔治王子城论文代写:风险调查

All of the teams involved in the phase of implementation and planning should consider an investigation of a number of risks that are faced in the key activities. These are known to include the ones in relation with finance, operations, liability, reputation based risks and interruption of business, and the active management and mitigation of risks. Such approaches in context with risk management will range from the introduction of tighter procedures of safety in order to transfer risk via insurance from third party. Public private based partnership holds the tendency of offsetting risks of finance faced by host governments. The hosting of mega- event is known to present a significant opportunity for the development of cutting- edge technology and design itself for the event. However, it does have a bigger impact. It is known for spurring the introduction of new technologies having a positive knock- on impact all across the economy that speeds up urban transformation and innovation.

乔治王子城论文代写:风险调查
However, the creation of some iconic building for mega- events have ended pushing the borders of design. As a significant example, the geodesic dome of Montreal, now known to be an environment based museum, has been identified as a lasting legacy of the World Expo in the year 1967 (Jago et al. 2010). But there is extension of innovations moving well ahead of the sites of event. The investments of South Africa for the World cup in the year 2010 that include innovations like efficient lighting of street and systems of traffic management, stadium floodlights of energy efficiency at the stadium of Philippi, heaters of solar water attached to roof tops across the Western region of Cape and there has been generation of hydropower from spring water. However, there must be development of infrastructure while perceiving the future needs and expectations of the nation.