由于限制访问的网站会有一个问题在创造建筑的建筑图。因为外墙是现有的,所以内部建设必须做在一个封闭的球体,这可能是有问题的员工。由于受限制的访问也有良好的内部转移的问题(科尔等人,1992)。携带大型钢板将是一个问题。也有不完美的地方储存的钢铁所覆盖的居民来自四面八方。也可用的水面积减少。为了避免问题与封闭的领域,我们将确保建筑物的内部有适当的照明系统,所以工人们没有发现一个问题相关的可见性。携带的大盘子和其他好不能通过小的门,我们将使用直升机和所需的材料将通过上层建筑的通风。

由于现有的墙壁地板和天花板会有许多问题。第一个问题是有关工人的安全。建筑物的墙上没有一个很好的条件和预期他们会下降。只要内心将重建的一部分,外墙可能下降由于突然的压力。在建筑内部块的外墙可能下跌,整个建筑倒塌。此外,由于建设会有大量的灰尘和其他污染物的租户可以为相同的抱怨。现有的上限将被打破,大量可以采取内部通过直升机。此外,按照最初的计划天花板的高度需要更高。因此,整个天花板将被打破。现有的地板会修复,砖块和灰泥的新床将地板上完成。

美国毕业论文代写:与建筑施工相关的问题与答案

Due to the restricted access of the site there would be a problem in creating the architectural map for the building. Since outside walls are existing, so the inner construction will have to be done in a closed sphere, which may be problematic for the workers. Due to the restricted access there is also a problem of transferring of the good inside (Cole et al,1992). Carrying large sized steel plate will be a problem. Also, there isn’t perfect place for the storage of the steel as it is covered by the residents from all sides. Also the water available in the area is less. To avoid the problem related to closed sphere, we will be ensuring that the inner part of the building has proper lighting system so that the workers do not find a problem related to visibility. To carry the big plates and other good which can’t be carried through the small doors, we will be using the helicopter and the required material will be carried through the upper vent of the building.

Due to the existing walls floors and ceilings there will be a number of problems. The very first problem is related to the security of the workers. The walls of the building are not in a very good condition and it is expected that they may fall any time. Whenever the inner part will be reconstructed, the outer walls may fall due to the sudden pressure. While construction of the inner block the outside walls may fall and the entire building may come down. Moreover, the due to the construction there would be large amount of dust and other pollutants which the tenants can complain for the same. The existing ceiling will be broken so that the large blocks can be taken inside through the helicopters. Moreover, as per the initial plan the ceiling’s height needs to be higher. Thus, the entire ceiling will be broken. The existing floors would be repaired and a new bed of bricks and plaster would be done on the floors.