有时候公司的短期上市是根据回答的方式完成的,这些回答是关于公司如何处理某些关键问题,如处理项目涉及的风险,现金流量等问题的答案。在最后的过程中,应准备结构化的报告以提供更好的会计记录。

资格预审步骤的场景应用

项目选择是在决定投标公司通常面临的一些潜在投资项目之前所采取的第一步。

在这个场景中,这一步提到了需求分析,这里需要的是为医疗服务开发一个在线应用程序和注册系统。

第二项要求是对项目进行详细的准备,该项目有两个级别。

1)建立有组织的治理结构

2)在投标之前敲定所有准备工作。

现阶段进行可行性研究。接下来要采取的步骤是

1)建立一个项目小组

2)聘用团队顾问

3)制定项目计划

建立一个团队对项目领导者来说总是一种压力。Meredith Belbin用来区分合格与合适的候选人之间。符合条件的候选人有适合多年工作经验的简历,而合适的候选人则能胜任这份工作。Belbin建议我们尝试访问实际的技能,而不是以往的经验(Fox和waldt,2008)

应该建立一个团队领导来指导团队并帮助组织的发展。

项目计划是这个项目涉及到哪些因素的细节。对于应用程序项目计划,包括应用程序的输入和输出。

在任何项目启动投标之前,必须考虑以下几点

1)必须准备详细的商业案例。

2)公私合同的详细设计。

3)采购方式的选择

4)评标标准的选择

5)公私合同草案

加拿大论文代写:项目资格预审

Sometimes short listing of companies are done on the basis of responses that are submitted to a set of  questions of how the companies would address certain key issues like handling the risk involved in the project, cash over flow etc. In the final process, a well structured report should be prepared to provide a better accounting record.

Application of prequalification steps to the scenario

Project selection is the first step taken before deciding on the tender companies normally face with a number of potential investment for the projects.

In this scenario this step is referred has Requirement Analysis and the requirement here required is developing an online application and registration system for customers in Medical services.

The second requirement is a detailed preparation of the project which has two levels

1)Setting up a  organized governance structure

2)Finalizing all preparation before a tender is launched

This phase is referred has feasibility study. The steps to be followed are

1)Set up a project team

2)Engage team advisers

3)Develop a project plan

It is always a stress for project leaders in setting up a team. Meredith Belbin usefully distinguishes between eligible and suitable candidates. Eligible candidates have suitable CV with years of experience while suitable candidates do the job well. Belbin suggests we should try to access actual skills rather than the past experience (Fox and Waldt, 2008)

A team lead should be set up to guide the team and help in the growth of the organization

A project plan is the details of what factors are involved in this project. For the application project plan consist of inputs and outputs of an application.

Before a tender is launched on any project these following points must be considered

1)A detailed business case has to prepared

2)A detailed design of public private  contract

3)Selection of procurement  method

4)Selection of bid evaluation criteria

5)A draft of Public private contract